INFOSANTIER

How do I measure and calculate waste

Measuring surfaces and calculating material waste

Surfaces to be clad with stone tiles can be measured with a tape measure, a folding ruler, or a laser (distance meter). If the area to be clad has a classic geometric shape (square, triangle, rectangle, trapezoid, rhombus, parallelogram, hexagon, circle, etc.), or can be approximated to a known shape or a sum of such shapes, the area is calculated using standard plane-geometry formulas. So:

  • for a triangle: B x h / 2, where B = base and h = height

  • for a rectangle: L x l, where L = length and l = width

  • for a square: L², where L = the side

  • for a parallelogram: B x h, where B = base and h = height

  • for a trapezoid: (B+b) x h / 2, where B = the long base, b = the short base, h = height

  • for a rhombus with two equal adjacent sides: d1 x d2 / 2, where d1 and d2 are the diagonals

  • for a circle: ΠR², where Π = 3.14 and R = the radius

In most cases, surfaces can be broken down into standard geometric shapes, and the area is calculated using the formulas above, with the total surface obtained by adding up the component areas.

If you know A, the total area to be clad, and S, the size of the stone tile chosen for cladding, then the total number of tiles is n = A/S. On top of this number of tiles, buying a surplus of about 10%-15% is recommended.

This way we cover:

  • approximations made in estimating the surfaces

  • any tiles that break or get damaged during transport or installation

  • any color variation that could affect the desired cladding pattern

There’s no fixed formula for how much extra stone to buy; some products, through their standard delivery quantities (e.g. SKIN flexible slate, cobblestone, etc.), may already result in extra quantity, so buying a surplus in other cases ultimately comes down to the customer’s decision.